Testing & Production
Made in Selangor. Tested on the water.
Each product is engineered with a strong emphasis on durability, safety, performance, and long-term operational efficiency, then tested under real operating conditions before it is put to work.

Four stages
Four stages, from HDPE sheet to tested hull.

Cut
Precision cutting of HDPE sheets to the required dimensions.

Shape
The materials are shaped according to the boat design.

Weld
Assembled and joined using specialised hot-wedge welding, for strong, durable and watertight joints.

Test
Impact, sea and pontoon tests under real operating conditions.
Sea trial
A hull running the test reservoir.

Production · Jon Boat 3m & 5m
Precision-cut sheet, hot-wedge welded.
The production process begins with precision cutting of HDPE sheets to the required dimensions. The materials are then shaped according to the boat design before being assembled and joined using specialised hot-wedge welding techniques, ensuring strong, durable, and watertight joints.
Production · V-Hull, 5.4 metres
Forming a 5.4-metre V-hull.
The production process involves cutting and shaping HDPE sheets to form a 5.4-metre V-hull boat with a 2-metre beam.

Impact test
Struck by hand, at the factory.
HDPE hulls are struck with a sledgehammer at the factory, in front of visiting delegations. HDPE offers excellent resistance to impact, corrosion and UV exposure.
Sea test
Stability, buoyancy, predictable handling.
The sea tests for the HDPE V-Hull, 3-meter Jon Boat, 5-meter Jon Boat and Pontoon were successfully carried out under real operating conditions. Throughout the trials, all vessels demonstrated excellent stability, buoyancy, and predictable handling. The V-Hull delivered smooth performance and good directional control in open water, while the Jon Boats showed strong stability, easy maneuverability, and reliable performance in calm and shallow waters. Overall, the results confirm the vessels' structural integrity, operational safety, and readiness for practical use in patrol, utility, and inland water operations.

Pontoon test
The Beast, rigged for drilling.
The Beast pontoon platform on the water with a drilling rig on deck — the use it is specified for: drilling and geotechnical works, with a maximum payload of 6,000 kg.